Hi,
I'm using the scheduled backup feature of BR16 to do full disk backups of my C: and D: drives on a weekly basis.
I have selected the retention option "Keep at least 3 backups".
It seems that when the 4th backup is taken, the oldest one is automatically removed (so ONLY 3 backups are kept).
Is there a way to keep more than 3 when using the inbuilt scheduling option
I would actually like to control when they are deleted, but I do want to use a schedule to take the backups in the first place.
Thanks!