kazmax
19-10-07, 12:10 AM
Paragon Drive Backup Pro 8.51
1) I just launched the Windows task scheduler, and it shows the backup jobs I've scheduled. One ran at 4am this morning, as planned. In the Drive Backup scheduled task screen it advises the last result as 'Succeeded'. However in the Windows task scheduler is says 'Running'. I think this must be a bug in Drive Backup.
2) I just tried to configure a new scheduled backup, and it refused to allow me to specify a backup name because the folder of that name already existed. I do not wish to allow DB to create random names for my backups - I want them overwritten each week. I'm curious whether DB is going to allow me to overwrite backups? There doesn't appear to be an option in the configuration to allow this.
Andrew
1) I just launched the Windows task scheduler, and it shows the backup jobs I've scheduled. One ran at 4am this morning, as planned. In the Drive Backup scheduled task screen it advises the last result as 'Succeeded'. However in the Windows task scheduler is says 'Running'. I think this must be a bug in Drive Backup.
2) I just tried to configure a new scheduled backup, and it refused to allow me to specify a backup name because the folder of that name already existed. I do not wish to allow DB to create random names for my backups - I want them overwritten each week. I'm curious whether DB is going to allow me to overwrite backups? There doesn't appear to be an option in the configuration to allow this.
Andrew